Building Dreams, Crafting Realities

+1 346-250-7210

info@gdiengdesign.com


Hospitality

Hospitality Projects

Completed

  • Frullati Caffee

    Frullati Caffee

    In the architectural context, the design incorporates a comprehensive array of MEP fixtures to ensure the functionality and efficiency of the space. These MEP fixtures include: PROVIDE EQUIPMENT INDICATED ON THE DRAWINGS, AND AS REQUIRED FOR A COMPLETE FUNCTIONING SYSTEM. MODIFICATION TO THE EXISTING PLUMBING SYSTEM AND PROVIDING NEW MATERIALS, FITTINGS AND ACCESSORIES NECESSARY FOR A COMPLETE FUNCTIONING PLUMBING SYSTEM.


    • Project Name: Frullati Cafe
    • Client: Bluestone Partners, LLC.
    • Location: 2271, 730 HOPKINS STREET, UNIT 100, SAN MARCOS, TX 78666
    • Surface Area: 1400 SF
  • Abilene Hotel

    Abilene Hotel

    Abilend Multifamily Apartment MEP + Fire Sprinkler Design Abilene apartments is a renovation project from a 1960s 2-story hotel. GDI Engineering is tasked with designing entirely new mechanical, electrical, plumbing and fire sprinkler system. Architectural design is currently underway and GDI is in close collaboration from the onset in the design process.


    • Client: NWG Properties, LLC
    • Construction Date: -
    • Location: 774 East Hwy 80, Abilene, Texas 79601
    • Surface Area: ~3.02 Acers
    • Contracting Investor: NWG Properties, LLC
    • Value: ~ $1.8 M
    • Category: Multifamily apartments
  • Cafe Leander

    Cafe Leander

    The MEP set for the Cafés Leander includes air conditioning, heating, and ventilation layout, heat load, and ventilation calculation for the proposed building program schedule of equipment, equipment cut sheets, and general details, power layout showing the existing and the new outlets, power feed to equipment and appliances, lighting layout for the shop floor and the drive-thru area including switches and energy code compliance for lighting controls, power riser diagram and panel board schedule, power analysis to validate the shell feeder for the building needs, water supply layout showing the cold, hot and filtered (RO) water, drainage layout showing the direct and indirect waste connections, grease lines and trap and vent pipes, gas layout showing the meter & connections to equipment and appliances, gas isometric layout showing the whole network from the meter till the farthest connection, water supply and drainage fixtures units, gas sizing schedule, and water supply and drainage riser diagrams.


    • Client: LVL 8 Consulting
    • Location: Leander, TX Area: 1700 SF
    • Category: Hospitality
  • Delamar Greenwich Hotel

    Delamar Greenwich Hotel

    • Client: D’Amore Studio
    • Location: Greenwich, Connecticut
    • Surface Area:
    • Contracting Investor:
    • Category: Hospitality
  • Nance Cafe

    Nance Cafe

    Nance Cafe is a TI project converting a studio to a cafe. GDI Engineering is providing the MEP design.


    • Client: Nance - Ronin Cafe
    • Location: 1310 Nance St. Suite C Houston, Texas 77002
    • Surface Area: 1,715 SF
    • Contracting Investor: Ronin Art House
    • Category: Hospitality

In Progress

  • Wealder Cafeteria

    Wealder Cafeteria

    Alteration of the Gym building to serve as a catering building + kitchen include: New electric, plumbing, HVAC, New windows, ext. & int. doors, painting, insulation, flooring, fire alarm , sprinkler system including new fire line from water main and New commercial kitchen with serving line.


    • Client : L.M. Holder III
    • Location: 201 US 90, Austin, Waelder, TX, 78959
    • Area: 9,654 sqft
  • TJ Seminole Restaurant

    TJ Seminole Restaurant

    Description: Preparation of MEP set for front of house area addition and back of house alteration


    • Client : WCA Architects
    • Location: 2104 HOBBS HIGHWAY, SEMINOLE, TEXAS 79360

Do You Need Similar Project? Call Us

Try it for free . No registration needed.Â