Building Dreams, Crafting Realities

+1 346-250-7210

info@gdiengdesign.com

commercial

Add Your Heading Text Here

Commercial

We provide comprehensive design solutions for commercial spaces that enhance productivity, collaboration, and employee satisfaction. Our designs prioritize flexibility, allowing businesses to adapt their environments as needs change. We focus on creating engaging workplaces that inspire creativity and support teamwork.

Additionally, our commitment to integrating technology into commercial spaces ensures that our designs are future-ready. By incorporating smart systems and sustainable materials, we create environments that not only boost employee morale but also contribute positively to the overall business strategy.


Here we will add some sample of projects similar to Landing page. So in the page make a place for it. I will send you the project for each sector later Do it for all pages in sector

Have a Project in Mind? Contact Us for a Free Consultation!

No Registration Needed—Get Started Today!

Sample Of Projects

51unit fitness

Client: Stuckey Architects
Location: 709 WH 199
Springtown, Texas 76082
Surface Area: 9,181 SF

U-Haul - College Station

Client: Altar Group
Location: 2823 TEXAS AVENUE,
COLLEGE STATION, TX 7784
Surface Area: 85,391 SF

West Texas Graduation Services

Client: WCA Architects
Location: 4319 50TH STREET
Lubbock, Texas 79413
Surface Area: 6,500 SF

304 Progress St Property

Client: Bluestone Partners, LLC
Location: 304 PROGRESS
DR. SHERMAN, TX 75092
Surface Area: 48,704 SF

801 BURLINGTON RD Office Warehouse

Client: Tarrant Commercial Real Estate Services LLC
Location: Saginaw, Texas,
Surface Area: 6,470 SF

Willow Bend offices

Client: Stuckey Architects 
Location: Willow park, Texas 76008
Surface Area:Two (2) shell Office Buildings           Building #1:          5,882 sf – shell. Only           Building #2:          5,992 sf – Shell only

51unit fitness

Client: Stuckey Architects 

Location: 709 WH 199 Springtown, Texas 76082 

Surface area: 9,181 SF 

The 51 Unit Fitness Facility project focuses on the comprehensive preparation of Mechanical, Electrical, and Plumbing (MEP) systems for a shop alteration transforming the space into a modern fitness center. Our technical proposal emphasizes adherence to local codes while tailoring MEP services to meet the specific need of the client. This includes detailed planning for utilities such as electrical and gas, alongside a complete mechanical scope that covers ventilation and air conditioning systems. Our approach ensures that all air conditioning solutions are aligned with existing mechanical equipment and the new calculated loads, providing optimal comfort for fitness center patrons. 

In addition to mechanical considerations, our electrical scope encompasses lighting and power supply, ensuring effective distribution and compliance with applicable standards. This includes the selection of lighting fixtures and controls, as well as the necessary infrastructure for power receptacles and client equipment. Our plumbing system design addresses all wet areas, central hot water systems, and necessary gas connections, ensuring a fully integrated service. We will also facilitate connections to the sewer network where available. The project will commence upon receipt of complete client responses to our technical inquiries, ensuring that we meet the highest standards from the outset while remaining responsive to any adjustments required throughout the process. 

Sample of drawings:

U-Haul - College Station

Client: Altar Group 

Location: 2823 TEXAS AVENUE, COLLEGE STATION, TX 7784 

Surface area: 85,391 SF 

This project involves the MEP (mechanical, electrical, and plumbing) design for a new 3-story climatecontrolled self-storage building in College Station, Texas. The mechanical design considers a fully air-conditioned and ventilated building, providing HVAC for occupant comfort and air renewal, as well as exhaust systems. The HVAC will likely be provided by packaged rooftop units or split air handlers, with provisions for humidity control. Mechanical equipment sizing will be based on detailed load calculations. 

The electrical design includes a comprehensive lighting layout with controls, power distribution for receptacles, HVAC, plumbing, and other systems. A single electrical service with a load analysis and panel schedules is included. Exterior lighting and potential EV charging stations are also part of the scope. 

The plumbing design covers the domestic water supply, sanitary sewer, and gas piping systems. Plumbing fixtures and equipment will be specified based on calculated demands. Exterior utilities will be coordinated with the civil engineer. 

The MEP design will comply with all relevant codes and standards. It includes addressing one round of internal review comments and any comments received during the permitting process. Construction administration services are not included. 

Sample of drawings:

West Texas Graduation Services

Client: WCA Architects 

Location: 4319 50TH STREET Lubbock, Texas 79413 

Surface area: 6,500 SF 

Located in Lubbock, Texas, the West Texas Graduation Services project involved the meticulous preparation of a comprehensive MEP design set for a 6,500 sq. ft. expansion. This included the addition of both storage space and office facilities within the existing building. Our team ensured that all MEP services conformed to local codes and were tailored to meet the specific needs of the client, incorporating a new demising wall, as well as ventilation and air conditioning solutions for the newly altered areas.

The electrical scope encompassed both lighting and power supply, with careful selection of fixtures and controls to meet regulatory standards. Additionally, the plumbing system was designed to accommodate new fixtures, including point-of-use electric water heaters. Throughout the process, we collaborated closely with the client to address technical inquiries and ensure compliance, ultimately facilitating a smooth permitting process.

Sample of drawings:

304 Progress St Property

Client: Bluestone Partners, LLC  

Location: 304 PROGRESS DR. SHERMAN, TX 75092

Surface area: 0.792 Acers, Building: 48,704 SF 

Located in Sherman, TX, the 304 Progress St Property involves a multi-building addition to an existing warehouse. This project consists of the construction of four new warehouses designed as cold dark shells, providing a flexible foundation for future interior tenant improvements. Our team provided comprehensive MEP (Mechanical, Electrical, and Plumbing) design services tailored to the client’s needs. The design flexibility allows for varying numbers of tenants in each building, ensuring that all requirements are met as the project evolves.

Our mechanical systems include detailed load calculations to establish appropriate gas and electrical provisions, as well as air conditioning and heating specifications. The electrical design features both normal and emergency lighting plans, complete with advanced lighting controls for optimal efficiency in each warehouse. Additionally, we developed a power supply layout that outlines circuitry assignments, provisional panels, and service equipment locations, all coordinated with a single line diagram to illustrate utility connections.

For plumbing, we’ve accounted for leave-outs for water supply, sewer, and gas systems, aligning with the client’s program for tenant accommodations. While our MEP package focuses on these essential services, the civil engineering team is responsible for developing the site plan for underground utilities. This collaboration ensures a streamlined approach to the project, delivering a robust infrastructure tailored to the future needs of the tenants.

 

Sample of drawings:

801 BURLINGTON RD Office Warehouse

Client: Tarrant Commercial Real Estate Services LLC

Location: Saginaw, Texas

Surface area: 6,470 SF 

The 801 Burlington Rd Office Warehouse project, located in Saginaw, Texas, exemplifies our commitment to delivering comprehensive MEP design services tailored to meet the unique needs of modern commercial spaces. Our team executed meticulous plumbing design and engineering, which included the creation of a General Notes and Specification Sheet, detailed water supply calculations, and sewer calculations. We designed a robust water supply plan, selected suitable water heaters, and ensured all gas calculations were accurately performed, complete with isometric riser diagrams. Moreover, our diligent response to plumbing plan-check corrections culminated in the successful approval of the plumbing design.

In addition to plumbing, our mechanical design encompassed HVAC system design and ventilation calculations, all grounded in thorough heat load assessments using Hourly Analysis Software (HAP). Our mechanical engineering efforts were supported by a comprehensive General Notes and Specification Sheet, allowing for efficient communication and execution of the project. Similarly, our electrical design services included developing a detailed power plan, lighting plan, and load calculations, culminating in a fully functional panel board schedule and single-line diagram. The meticulous planning and execution of these engineering disciplines highlight our dedication to delivering high-quality, integrated building systems that ensure both functionality and efficiency in the 801 Burlington Rd Office Warehouse.

Sample of drawings:

Willow Bend

Client: Willow Bend offices

Location: Stuckey Architects 

Surface area: Two (2) shell Office Buildings

          Building #1:          5,882 sf – shell. Only

          Building #2:          5,992 sf – Shell only

The Willow Bend Offices project encompasses the design and development of two shell office buildings, with Building #1 measuring 5,882 square feet and Building #2 at 5,992 square feet. This ambitious project has been in the works for some time, and our team has successfully delivered high-quality MEP design services that meet the evolving needs of the client. Despite the challenges of working with quoted fees from two years ago, we have maintained our focus on providing exceptional value and service.

Our MEP design includes comprehensive plans for HVAC, plumbing, and lighting systems tailored for a shell space. The HVAC system is designed for future tenant finish-out, ensuring flexibility for various tenant requirements. The plumbing layout features a trunk line configuration, with careful attention to utility connections. Additionally, our electrical plan encompasses exterior lighting, site lighting with possible pole installations, and a thorough electrical load analysis in compliance with NEC standards. We have prepared the necessary calculations and site plans to effectively support the project’s successful completion.

Sample of drawings: